We obtained the first building permit in Cekmekoy.

We built a place for the engineers and architects on site.

We secured the site and built barracks for the workers.


We brought electricity and found water.

Application using satellites. When we applied for the foundation permit, the errors of application was less than 5 millimeters for about 200 readings.

Excavation. We did not only place the villas right in 2 dimensions, but also in the 3rd dimension.

We built the foundation on stone chips with cement on it. Iron and wood ready for the next step.

Last thing we wanted was water in the villas and we also protected our insulation with cement.

Iron workers prepared the foundation and electrical workers secured grounding for the villas.

We built the sewerage in the foundation and then started pumping the cement in.

Then started the basement concrete walls.

See the quality of concrete. Attention is given that insulation has to be supported with water drainage.

Finally of the ground level. First slab started.

Sometimes the site is an assembly line where all happens at the same time.

We are always there night or snow.

Compete with time and used multiple casts.

Brick walls, accurate both vertically and horizontally.

The final step of basement insulation.

Facade plaster with accuracy. Precise and safe steel roofs.

What is going inside: state of the art electrical and mechanical works.

What is going outside: sewage

Finally the roof and facade.