| We obtained the first building permit in Cekmekoy.
|
|
| We built a place for the engineers and architects on site.
|
|
|
| We secured the site and built barracks for the workers.
|
|
|
|
We brought electricity and found water.
|
 |
 |
|
Application using satellites. When we applied for the foundation permit, the errors of application was less than 5 millimeters for about 200 readings.
|
|
|
Excavation. We did not only place the villas right in 2 dimensions, but also in the 3rd dimension.
|
 |  |
|
We built the foundation on stone chips with cement on it. Iron and wood ready for the next step.
|
 |
 |
|
Last thing we wanted was water in the villas and we also protected our insulation with cement.
|
 |
 |
|
Iron workers prepared the foundation and electrical workers secured grounding for the villas.
|
 |
 |
|
We built the sewerage in the foundation and then started pumping the cement in.
|
 |
 |
|
Then started the basement concrete walls.
|
 |
 |
|
See the quality of concrete. Attention is given that insulation has to be supported with water drainage.
|
 |
|
Finally of the ground level. First slab started.
|
 |
 |
|
Sometimes the site is an assembly line where all happens at the same time.
|
 |
 |
|
We are always there night or snow.
|
 |
 |
|
Compete with time and used multiple casts.
|
 |
 |
|
Brick walls, accurate both vertically and horizontally.
|
 |
 |
|
The final step of basement insulation.
|
 |
 |
|
Facade plaster with accuracy. Precise and safe steel roofs.
|
 |
 |
|
What is going inside: state of the art electrical and mechanical works.
|
 |
 |
|
What is going outside: sewage
|
 |
 |
|
Finally the roof and facade.
|
 |
|
|
|
|
|
 |